The work comprised the construction of three new golf holes and large lake at Drax Golf Club, Selby.
The construction work involved various phases :
· Site clearance and topsoil strip
· The excavation of the lake area and depositing of the material in landscaped bunds and greens and tees
· Total land drainage systems throughout
· Construction of greens and tees to designers specification using locally sourced materials
· The installation of the irrigation system
· Soil preparation and seeding